Blue Water Controls  
Flash: OFF This site is designed for use with Macromedia Flash Player. Click here to install.   September 4, 2010 
Search:     

Contact Info:
Blue Water Controls
5631 Flinchbaugh Rd.
Kimball, MI  48074
Phone: 810-300-2926
Contact Via Email

Navigation:
Home
Assembly Machines
Controls Projects
Panel Builds
End Of Arm Tooling
Vision Verification
Error Proofing
Manufacturing Engineering
Water Treatment

User Login:





To apply for an
account, click here

Forgot username or password?

 
 

Error Proofing
Blue Water Controls is dedicated to working with our customers to develop manufacturing systems that will prevent mis-assembled parts, or parts with missing components from leaving their manufacturing and assembly equipment.

In addition, consultation is available to prevent such occurences prior to manufacturing through the PFMEA and Control Plan process.
 
Customer's problem: Prevention of parts entering packaging without the gasket present. 

Solution: Design and build a cost effective solution to inspect parts prior to entry in a controlled packaging system. A controls and pneumatics package were added for gasket verification, containing rejections in an isolated lock box. 

 
Problem: Misfilled parts had been identified causing assembly and function issues at assembly plant.

Solution: Existing equipment was modified with additional sensors and PLC programming changes to detect and contain such occurances.
Problem: Customer required a distance sensing option for detection of clip presence.                             Solution: BWC specified the proper sensor and mounting location for consistant detection.
Copyright ©  2010 Blue Water Controls. All Rights Reserved. Powered by Finalweb.